Lismore Workers Club

7 October 2025

The three stories of glass frontage, on the Lismore Workers Club building, created significant heat load issues for the front reception staff.

The heat load was so intense that on particularly hot days, the built up and trapped heat interfered with the club’s electronic registration and automatic doors. This is despite 30 kW’s of additional air conditioning being installed which virtually had no effect .

IN’FLECTOR Standard was then installed across the glass frontage of the building.

The significant heat reduction , reduced UV and glare, was immediately noticed. It was reported by staff and patrons, that for the first time they could feel the air conditioners for this area were actually doing their job